The Overnight Test

2 hours ago
1 min read

When were your AHUs last tested against their sequence of operations?


Midnight. The building is empty. AHU-3 is about to get a functional performance test of its control sequences, with nobody on site.


Functional testing usually means a commissioning agent and a controls contractor, scheduled around the building and done once at handover. Here's the same test with TwinWorX:


🕛 Preconditions. One workflow, built from standard blocks, checks the plant is available, the season allows each phase, and no overrides or safety alarms are active. Then it captures a baseline.


🔁 Test. Heating, economizer within outdoor air limits, and unoccupied setbacks. Each condition is held until it settles and compared with the sequence of operations. Forced values stay inside safe limits; a freeze-stat or low-limit alarm ends the test.


⚠️ 2:40 a.m. Air leaving the preheat coil is 2.5 °C warmer than the air entering it, with the valve commanded closed. Leak-by. Logged, with the trend.


↩️ 4:30 a.m. Every override is relinquished and each point confirmed back under the BAS, before morning start-up.


📋 7:00 a.m. The report is waiting. Two findings, each already a work order: the leaking preheat valve, and an outside air damper short of its commanded position. Cooling is marked "not tested, out of season" and waits for a warmer night.


Run the airside tests monthly, heating and cooling each season, and after every repair. Commissioning that doesn't stop at handover.


When were your AHUs last tested against their sequence of operations?