top of page

Keep the Controls, Lose the Lock-in

22 minutes ago
1 min read

How many controls vendors are you running today, and how many could you put out to bid?



Most portfolios run controls from several manufacturers, installed at different times by different contractors. Connecting them to one platform is the easy part to promise. The real question is what you get once they're connected.


Here's how it works with TwinWorX:


🔌 Connect. Read what's already installed: BACnet, Modbus, OPC and vendor interfaces, with a gateway for older proprietary networks. The controllers stay.


🗺️ One model, on open standards. Every point is mapped to one model built on Project Haystack, ASHRAE 223P and RealEstateCore, and it can take in a Brick model too. The model and the data are yours.


🔎 A library, not a blank engine. Fault detection starts from 1,000+ rule templates across 120+ equipment classes, including labs and healthcare, tuned to each site.


🗄️ Every point kept. A built-in historian with no licence limits on tags or retention. Already have a historian? Keep it.


☁️ Runs where you choose. In our cloud, in your own Azure tenant, or on-premise.


And then the part that pays: choice. At one US university, about 80% of buildings were locked to one controls vendor. Once the buildings were on one open platform, a $1M proprietary upgrade was avoided, and about $1M a year in maintenance was opened to competitive bids.


Keep the controls you have. Choose who you buy from next.


How many controls vendors are you running today, and how many could you put out to bid?

bottom of page